Current Projects
Outdoor Seating Phase 2
Started October 2016
The outdoor seating project was just a start. Parent Club has purchased an additional 13 benches and 3 picnic tables that will be installed on campus during October/November 2016.
Completed Projects
Outdoor Seating Area
Completed September 2016
In May 2016, Parent Club was awarded a $5000 grant from Lowes to install outdoor seating at CHS. Parent Club provided an additional $1500 to fully fund the project.
In September 2016 we completed the installation of five metal picnic benches on concrete pads overlooking the stadium, together with bright yellow umbrellas for shade. Thanks to Ed Stocklin, our awesome contractor, who donated his time and expertise. FFA students helped with the concrete pour and the autoshop students assembled the benches. Visit Photo Gallery